#75 Closed
Planner screen: draw final GUI textures
#enhancement
Artwork task, done by hand.
Scope: paint textures/gui/construction_planner.png over the placeholder regions from the texture spec ticket, in the Create GUI style, so it matches Job Detail, Waggle Port and Zapper.
Acceptance
- Every region in the spec table is painted, and coordinates are unchanged.
- It looks right in-game at GUI scale 2 and 4.